Flow Shop Scheduling on 2-Machines with Setup Time and Single Transport Facility under Fuzzy Environment

By: Material type: ArticleArticlePublication details: Description: 50 (1) Jan-Mar2013, 14-24pSubject(s): In: BV- Opsearch (Jan-Jun 2013)Summary: The objective of this paper is to minimize the makespan for two machines flow shop scheduling, in which processing time, setup time each are under fuzzy environment including the significant transportation time. Further a single transporting agent which carries the jobs from first machine to second machine and returns back to first machine is considered. An algorithm to find the optimal sequence of jobs processing, minimizing the total flow time is discussed. The optimality of the solution is verified by a mathematical theorem. A numerical illustration at the end is also given to justify the proposed algorithm.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode
Articles Articles Main Library Available AR16032

The objective of this paper is to minimize the makespan for two machines flow shop scheduling, in which processing time, setup time each are under fuzzy environment including the significant transportation time. Further a single transporting agent which carries the jobs from first machine to second machine and returns back to first machine is considered. An algorithm to find the optimal sequence of jobs processing, minimizing the total flow time is discussed. The optimality of the solution is verified by a mathematical theorem. A numerical illustration at the end is also given to justify the proposed algorithm.

There are no comments on this title.

to post a comment.

Powered by Koha