Financial Viability Analysis,Capital Structuring and Sensitivity Analysis of Colaba-Bandra Line of the Mumbai Metro Railway Project

By: Contributor(s): Material type: Mixed materialsMixed materialsLanguage: ENG Publication details: MMS 2008Description: 62pSubject(s): DDC classification:
  •  
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Notes Date due Barcode
Projects Projects Main Library (Browse shelf(Opens below)) Available Summer Project with CD PJ721

There are no comments on this title.

to post a comment.

Powered by Koha