Project Finance and Risk Management : A Case Study of an Independent Power Project (Record no. 20641)

MARC details
000 -LEADER
fixed length control field 01592pab a2200217 454500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 140923b2002 xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Welingkar Institute of Management Development & Research, Mumbai
Original cataloging agency Welingkar Institute of Management Development & Research, Mumbai
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title ENG
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number
Item number Jay/Aro
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Jayadev M
245 ## - TITLE STATEMENT
Title Project Finance and Risk Management : A Case Study of an Independent Power Project
250 ## - EDITION STATEMENT
Edition statement 4
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc. Udyog Pragati
Name of publisher, distributor, etc. Oct - Dec
Date of publication, distribution, etc. 2002
300 ## - PHYSICAL DESCRIPTION
Extent 46-64 pp.
490 ## - SERIES STATEMENT
Volume/sequential designation 26
520 ## - SUMMARY, ETC.
Summary, etc. Financing of industial and infrastructure projects through project finance structure has gained importance in the post liberalization period. Although project finance structure has several merits over the traditional corporate finance, it is embedded with various operational and financial risks. Therefore, evolving a risk management structure and sharing of risks among various parties is essential for success of the project. The present case demonstrates risk-management framework of an independent power project. The sensitivity analysis demonstrates profitability sensitivity of the project with reference to plant load factor and auxiliary consumption. The case also highlights tariff structure and statutory and non-statutory clearances required for a project in India. It also demonstrates other constraints for success of an independent power.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Case Study-Power Project, Project Finance,
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Arora Sachin
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://192.168.6.13/libsuite/mm_files/Articles/AR5143.pdf">http://192.168.6.13/libsuite/mm_files/Articles/AR5143.pdf</a>
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
a 11882
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Cost, replacement price Price effective from Koha item type
        Main Library Main Library 01/01/1900 0.00   Jay/Aro AR5143 23/09/2014 0.00 23/09/2014 Articles

Powered by Koha